MƏHSUL PARAMETRLƏRİ

  13.5m Aerial Work Platform FAW

layihə Təsvirlər Texniki xüsusiyyətlər
General Overall dimensions(mm) 5990*1980*2950
Total mass(Kg) 4495
Curb weight(Kg) 4365
Üst qurğu / Kuzov Maximum operating height (m) 13.5
Maximum operating range(m) 6.5
Rotation angle 360°
Work bucket size(mm) 1080X620X1150 
Work bucket Material High-strength stainless steel
Work bucket load(kg) 200
Şassi

 

Şassi markası FAW
Driver form 4*2
Steering wheel Left hand drive
Mühərrik markası və modeli Q23-115E60
Max engine power(Kw) 85
Sürətlər qutusu 5-speed transmission

TEXNİKANIN ÜSTÜNLÜKLƏRİ

EXCELLENT SAFETY CONFIGURATIONS

1. Dual hydraulic lifting cylinders: The two cylinders are symmetricallystressed, which can avoid structural deformation caused by unilateral eccen-tric load and reduce platform shaking.
2. Balance valve: lt can maintain the load, control the speed, and preventload loss and dropping.
3. Pentagonal structure: lt achieves a balance between high strength andlight weight.
4. Hydraulic oil tank: lt functions to store oil, dissipate heat, precipitate impu-rities and separate air.
5. Radiator: lt prevents the oil temperature from being too high, avoids defor-mation and damage of key components, and improves the stability, accuracyand efficiency of operation.

STABLE CHASSIS DESIGN

1.Chassis outriggers: They provide stable support, enhance the load – bearingcapacity, and adapt to complex terrains.ICk
2. Outrigger level gauge: lt accurately measures the levelness of the outrig-gers, ensuring the equipment remains in a stable state during operation.

SIMPLE TO OPERATE

User – friendly control panel(touch screen/joystick), with a short trainingcycle and simple operation.

USER-FRIENDLY DESIGN

1.Operating seat
2.Outdoor heating chamber
3. Buffer wheels under the arm
4. Hooks under the arm

MULTIPLE PROTECTION DEVICES

1. 360 – degree turntable fault alarm
2.Emergency stop button
3.Guardrail for working at heightsA
4. Safety belt for working at heights

OTHER DETAILS

1.Hydraulic pipe wrapping
2.Outrigger warninglights
3. Wind speed detector
4.304 stainless-steel toolbox5.Winch

PRODUCTION PROCESS

1. Telescopic boom welding
2. Jib welding
3. Auxiliary beam welding
4. install the chassis on the auxiliary beam frame
5.Install the bottom plate on the base
6.Install the working arm on the chassis
7.install the work basket and other accessoriesANc
8.Completion of the vehicle superstructure installation

APPLICATION SCENARIOS

PACKAGING AND TRANSPORTATION

Satış sonrası xidmət və dəstək

Biz bütün məhsullarımız üçün ömürboyu izləmə xidməti və bir illik pulsuz zəmanət təqdim edirik. Eyni zamanda, məhsulunuzu təmir etməyinizə rəhbərlik etmək üçün pulsuz təlim və texniki dəstək göstəririk. Ehtiyac yarandıqda, orijinal ehtiyat hissələrini də hava yolu ilə pulsuz göndərəcəyik.

Çatdırılma müddəti

Sifarişlərin (ödəniş alındıqdan sonra) 24 iş günü ərzində göndərişə hazır olmasını təmin etmək üçün əlimizdən gələni edirik.

Çatdırılma bölgələri

İstər səs-küylü bir şəhərdə, istərsə də sakit bir adada olmağınızdan asılı olmayaraq, qlobal logistika şəbəkəmiz dünyanın istənilən suveren ölkəsinə və bölgəsinə problemsiz çata bilər.

Qiymət təklifi alın

Inquiry Now