PARAMETER PRODUK

5m³ Hooklift JAC

 

proyek Deskripsi     Spesifikasi
General  Overall dimensions(mm) 5325×1900×2240
curb weight(Kg) 3000
Loading capacity(Kg) 1365
Total mass(Kg) 4495
Superstructure Lift Capacity(Tons) 3-5
Matching trash bin volume (m³) 5
Hook arm material Q40, Q50 high strength steel
Sasis

 

Merek sasis JAC
Driver form 4*2
Steering wheel Left hand drive
Wheelbase(mm) 3365
Max engine power(Kw) 85
Standar emisi mesin Euro 6
Transmisi 5-speed gearbox

KEUNGGULAN KENDARAAN

HIGH-STRENGTH LOAD – BEARING CAPACITY

CORE COMPONENTS OF THE HOOK ARM

1. Hook – arm main body (main arm + telescopic arm + hook): Directlyhooks, tows and lifts the garbage bin. The telescopic arm can adapt to binsof different lengths.
2. Main oil cylinder: Provides hydraulic power for the rotation and exten-sion of the hook – arm, and controls the speed and force of the actions.
3. Locking mechanism: Locks the bin after hooking to prevent it from loos-ening during transportation; it is fixed in a linked manner during unloading.
4. Rollover frame: Connects the hook – arm and the auxiliary frame, enablesthe overall lifting and unloading, and withstands the overturning moment.
5. Auxiliary frame: Bears the hook – arm mechanism and the bin, and dis-tributes the weight to the chassis girder.

HYDRAULIC SYSTEM AND ASSEMBLY

1.Power take – off(PTO)
2. Hydraulic oil pump
3. Hydraulic oil tank
4. Main lifting cylinder
5. Built -in telescopic cylinder
6. Locking cylinder
7.Hydraulic multi – way valve
8.Hydraulic pressure gauge
9.Balance valve
10. Hydraulic oil pipe

SIMPLE AND INTELLIGENT TO OPERATE

1. Remote control: Enables single -person/remote operation.
2. Manual operating lever: Matched with the neutral return and safetyinter-lock design to ensure accurate and safe operation.

CONTAINER MATCHING

1.Household garbage bin
2.Mobile waste station
3.Construction waste bin
4.Sludge garbage bin
5.Tarp – covered garbage bin
6.Wing – opening garbage bin

PRODUCTIONPROCESS

1. Production blanking
2.Auxiliary frame manufacturing
3. Hook – arm main body assembly
4. Hydraulic component assembly
5. Auxiliary frame installation
6. Hook – arm mechanism and cylinder assembly
7.Completion of vehicle superstructure installation

APPLICATION SCENARIOS

PACKAGING ANDTRANSPORTATION

Layanan purna jual dan servis

Kami menyediakan layanan pelacakan seumur hidup dan garansi gratis selama satu tahun untuk semua produk kami. Di saat yang sama, kami menyediakan pelatihan gratis dan dukungan teknis untuk memandu Anda memperbaiki produk Anda. Jika diperlukan, kami juga akan mengirimkan suku cadang asli secara gratis melalui jalur udara.

Waktu Pengiriman

Kami berusaha sebaik mungkin untuk memastikan pesanan siap dikirim dalam waktu 24 hari kerja (setelah pembayaran diterima).

Area pengiriman

Baik Anda berada di kota yang ramai maupun di pulau yang tenang, jaringan logistik global kami dapat menjangkau setiap negara berdaulat dan wilayah mana pun di dunia dengan lancar.

Minta Penawaran Harga

Inquiry Now